www.bp.com/ |
We are continually looking for talented, committed and operose nation to guidance us shape the guise of energy for the imminent.
Operations Planner Tangguh Expansion Project
Jakarta
Role Synopsis
- Reporting to the Operations Engineer, the Operations Planner has a key role in delivery of the project Operational Readiness Plan for one of BPâs major projects. The postholder may transfer to Production Division after start-up.
- The role will start in an engineering contractors office, and subsequently move to site for construction, commissioning, start-up and operation.
- In the project phase, the main focus of the role will be:
- Build and maintain a schedule for operations readiness activities, covering both for project and host RPU, and integrate it with project schedule
- Own the operations risk management process â" risk champion role
- Coordinate the operations performance management process including preparation for monthly meetings covering progress on schedule, cost, risks and action tracking
In the project the planner will:
- Develop and document a detailed schedule of work for Operational Readiness Activities, ensuring that all detailed schedules interface and tie back to the Project Master Control Schedule (MCS).
- Develop interfaces with the other parts of the project to maintain a coherent and well established Operational Readiness Schedule. Participate in schedule risk analysis.
- Prepare appropriate detail and summary project control schedules consistent with Project Work Breakdown Structure (WBS) and Project Master Control Schedule (MCS).
- Compile progress reports for review on a weekly and monthly basis, including progress curves, completion estimates, Earned Value, etc. against targets.
- Assist Project Lead Planner with development and implementation of project wide progress measurement and reporting system
- Drive the quality and practicality of the six week Primavera Plan
- Coordinate review of impacts of emergent work on planned activities
- Facilitate planning meetings, including preparation of pre-read and relevant documentation.
- Create detailed plans in Maxim/ Primavera to support work delivery.
- Integrate plan with other field activities, and coordinate related logistics requirements
- At minimum bachelor degree in Engineering
- Experience in project planning / scheduling and / or project controls gained on a variety of different projects.
- Experience of working within the oil, gas or chemical industry on a project or operational role.
- Good Knowledge of both automated and manual project planning and scheduling techniques and programs, to include Primavera's P3.1 and P6
- Working knowledge of Maximo Maintenance Management System.
- Willing and able to be mobile in support of the project
- The successful candidate must have excellent communication and interpersonal skills to work effectively in a cross-cultural environment.
- Additionally, the candidate should have strong organizational skills and the ability to communicate across all levels of organization, with discipline engineering, supply chain, contractors, and shareholder companies.
- High level of initiative and ability to work independently to identify and set work priorities.
- Experience of planning in an operations environment.
- Experience of working in a multicultural environment ideally in Most of World location
- Removal Date: 22-Jun-2012
Jakarta
Role Synopsis
- Implement Major Rotating Equipment overhaul strategy, interval and costs
- Implement Condition monitoring strategy and help technicians with data analysis
- Perform System One performance monitoring via condition monitoring
- Perform root cause failure analysis and recommend corrective actions
- Agree technical roadmap to Inherently Reliable Facilities (IRF)
- Perform consistent implementation of mechanical condition monitoring systems across the platform equipments
- Maximise uptime and reduce business losses associated with Rotating machinery on Offshore platforms
- Implement Condition monitoring technologies and analyse results
- Arrange Run time tracker monitoring of Rotating/ Reciprocating equipments and plan overhaul and spares schedule
- Bachelor degree in Engineering
- A minimum of 15 years experience of project management and construction, in practical LNG Plant Facilities.
- Proficiency in the use of all Microsoft Office software including experience in Microsoft Project
- English language proficiency sufficient to support reporting requirements.
- Pre-FEED, FEED, Engineering, procurement. and Construction phases of Projects in the oil & gas industry
- Drive plant and equipment reliability through maintenance
- Drive production improvement for AESTL through investigation of losses and deep understanding of equipment performance
- Create information from data and feedback to modulate Maintenance Strategy
- Deliver main equipment overhauls against agreed plan and costs
- Actively liaise with R & M teams
- Maintenance Strategy Execution, PEI and ICE
- Automation team towards continuous Improvement and optimizing synergies for rotating equipments
- Develop National Staff capability and ownership
- Identify opportunities for application of new technology and sharing lessons with other platforms.Global Benchmark through technology
- Removal Date: 22-Jun-2012
operation - rotating
0 komentar:
Post a Comment
Note: Only a member of this blog may post a comment.